ALAN VANAMAMALAI
About Candidate
• Implemented the QA/QC system and processes at Pitt Meadows Plumbing &
Mechanical Ltd.
• Developed procedures for visual inspection, hydrotesting, preservation,
flushing/cleaning, and disinfection of domestic water piping.
• Ensured compliance with industry standards and client specifications for all
QA/QC activities.
• Prepared Inspection and Test Plan (ITP) templates to standardize inspection
workflows.
• Created registered piping traveler templates for systematic tracking of piping
components.
• Designed visual inspection templates to document inspection findings
accurately.
• Developed test pack templates to maintain consistency in testing procedures.
• Established structural and concrete inspection templates to support quality
control.
• Witnessed and validated hydrotest procedures to ensure system integrity.
• Conducted 100% visual inspection of welds to verify compliance with standards.
• Performed weld mapping, weld logging, and bolt-up reporting for traceability.
• Maintained preservation logs to ensure long-term protection of installed piping.
• Verified NDE calculations to confirm compliance with engineering
requirements.
• Compiled and submitted the turnover binder index, WPS, and procedures for
client approval.
• Coordinated with TSBC BSO for registered piping approvals and compliance.
• Ensured all QA/QC documentation was properly organized for project closeout.
• Communicated with project teams to address inspection and testing
requirements.
• Reviewed and submitted the final turnover binder for client acceptance.
• Ensured a smooth and compliant project closeout with all necessary
documentation.
• Successfully implemented QA/QC best practices, enhancing project efficiency
and quality.
QC Lead, Brymark Installation Group Inc (Nov 2019-Mar 2023)
• Preparation of Turnover packages as per subsystem index
• ITP prepared for each discipline (civil piping, structural, mechanical and piling).
• Underground and above ground Test package was prepared and witness the
Pressure test with client.
• Follow client to close out ITP and Quality verifying documents (QVD’s)
• Witness and inspect the pile cap weld inspection and offer for UT test to third
party NDE contractor.
• Reviewing the Geotechnical Lab reports.
• Preparation of Redline log and Redline drawings
• Preparation of RFI Log, preservation log and turnover tracker
• Preparation of NCR & QSR log. Also follow construction corrective & preventive
Measures.
• Inspect Belt splicing, shuttle chute installation and conveyor installation.
• Arrange Tie-in binders and review survey reports.
• Submit all turnover binder for approval and submit the final scanned copies to
client.