claudiughita1

About Candidate

Location

Education

B
B Eng. Mechanical 2025
University OVIDIUS Constanta

Specialization: Port's & Marine Installation and Equipment ( graduate 9,62 of 10)

M
Mechanical in heavy-duty industr 1998
High School G.S.I.M.C. Medgidia

graduate 7,86 of 10

Work & Experience

O
Offshore Installation Supervisor 2022 May - in present
3 C Metal

In charge with the upgrade nad installation of mooring system (chain guides, stoppers, structure; bearing supports; clamp rings, support cradle,..etc). Project Details/ Type of Vessel or Site _ Job Location _ Client: Upgrade / FPU Osman Gazi_ Filyos Shipyard- Turkey / TP OTC . Survey: Refurbishment scope of Pig cage, Wet Parking Frame and Flying Lead Deployment Frame. Project Details/ Type of Vessel or Site _ Job Location _ Client: Survey / Subse7 Base_ Filyos Shipyard- Turkey / SIA & Saipem . Coordination of the work’s /project’s on board, starting from planning of (materials, consumables, crew change when necessary); work strategies/stages (following the Scope of Work taking into account the availability/access to and in the installation provided by the Client); daily meetings (those with the Client, internal ones for task planning at the beginning of each shift including HSE); preparing and obtaining the approval of next day Work Permits ; the daily, periodical and final inspections (together with the Client's representative), prior to the release and handing over of the documents at the end of the tasks as well as the final ones, such as Quality and Completion Certificates, Mechanical Check List, the PWHT (post weld heat treatment) Reports (preparing and supervising these two processes very closely); Welding Joint’s Follow Up Mapp; Inspection Data Book ; the time sheets ; …,etc. Also, coordinating the NDT, scaffolding, rope access (when included in the project) and painting work’s. And at the same time, clarifying and putting together the technical details, time / man power and not only together with the Client and the Shore Management when extra jobs applies. And last but not least, survey at both BOPs (extra access, plus some other works to improve operation). Project Details/ Type of Vessel or Site _ Job Location _ Client: Rig Intake for well CO.PF, means integration / installation completion of Gravel , Solids Control, IWOCS, Well Test, Coil tubing, Landing String Pack’s and few other as Mouse Hole tubing, Accoustic piping,..etc; as per scopes onboard of DS 7 _ Angolan offshore_Valaris / Azule. Coordination of the work’s /project’s on board, starting from planning of (materials, consumables, crew change when necessary); work strategies/stages (following the Scope of Work taking into account the availability/access to and in the installation provided by the Client); daily meetings (those with the Client, internal ones for task planning at the beginning of each shift including HSE); preparing and obtaining the approval of next day Work Permits ; the daily, periodical and final inspections (together with the Client's representative), prior to the release and handing over of the documents at the end of the tasks as well as the final ones, such as Quality and Completion Certificates, Mechanical Check List, the PWHT (post weld heat treatment) Reports (preparing and supervising these two processes very closely); Welding Joint’s Follow Up Mapp; Inspection Data Book ; the time sheets ; …,etc. Also, coordinating the NDT, scaffolding, rope access and painting teams (when included in the project). And at the same time, clarifying and putting together the technical details, time / man power and not only together with the Client and the Shore Management when extra jobs applies. Project Details/ Type of Vessel or Site _ Job Location _ Client: Rig Intake for well NDU-WG10, means integration / installation of Gravel , Solids Control, IWOCS, Well Test, Coil tubing, Landing String Pack’s and few other as Wireline Tower platform extension, ROV, MLU & MWD, also, UTA Clamps and Spacers on both BOP’s …, etc, including electrical and optical fiber where required as per scopes onboard of DS 7 _ Angolan offshore_Valaris / Azule. Coordination of the work’s /project’s on board, starting from planning of (materials, consumables, crew change when necessary); work strategies/stages (following the Scope of Work taking into account the availability/access to and in the installation provided by the Client); daily meetings (those with the Client, internal ones for task planning at the beginning of each shift including HSE); preparing and obtaining the approval of next day Work Permits ; the daily, periodical and final inspections (together with the Client's representative), prior to the release and handing over of the documents at the end of the tasks as well as the final ones, such as Quality and Completion Certificates, Mechanical Check List, Bolts Torquing and Pressure Test Reports (the maximum pressure worked up to 17.5 K psi, using the single and double pump even the one from the Drill Floor along with the charter), the PWHT (post weld heat treatment) Reports (preparing and supervising these two processes very closely); Welding Joint’s Follow Up Mapp; Inspection Data Book ; the time sheets ; …,etc. Also, coordinating the NDT, scaffolding, rope access and painting teams (when included in the project). And at the same time, clarifying and putting together the technical details, time / man power and not only together with the Client and the Shore Management when extra jobs applies. Project Details/ Type of Vessel or Site _ Job Location _ Client: - Upgrades/ Reactivation of Installation, such as : Inspection of C&K , Cement and Stand Pipe Manifold’s Pipe Spools (meaning : pipe spools disassembly, buffering, NDT & QC Inspections, torquing and pressure testing – 17.5 K psi ); Mud Pits Sensors along with the spool penetrations ; Mud Guns replacement ; Sand Traps Tanks Spools connection; Mud Pits internal pipe spools replacement ; Raw Water spools replacement ; Cemenet Unit Area Dk. Drain spools renewal ; Preheating of Drawworks Brake Spline Hub prior reinstall ; …etc. _ Jackup Rig V 108 (ex ENSCO 108) _ ASRY Shipyard , BAHRAIN _ VALARIS. - Upgrades/ Reactivation of Installation, such as : XT Trolley deck plating; Eng. Room- Weather Dk; Fender Hooks/ Hangoff; C&K Manifold double isolation (PT at 15K psi ,and PWHT); Access step stairs at Mud Module near by PM Room; Dk extension on top of Wireline Tower; Additional APV Bottles for CMC installation; Full Installation of Mi-Swaco Cutting Dryer System; BB (Burner Boom) Lines upgrades (PT in between 500 and 10K psi) along with top side extension platform; JETTISON Skid for Explosive Container; Moon Pool Padeyes under Roatary Table; Over both boards Coflex Hanger pedestals; Derrick 10 T Which Foundation and Fairleads; Mud Pits Scales; High Pressure Line from Cement Room to Well Test Area nearby ROV (PWHT and PT at 15K psi); ADCP (Acoustic Doppler Current Profiler) System gantry and overboard platform; Upgrading of X-mas Tree Storage Areas 1 & 2 by new plate and removable handrails; …., etc. _ Drill Ship DS 8 _ Las Palmas Shipyard, Spain _ VALARIS. - Replacing of all STBD & PS - B.O.P. (Stack A and B) , CSR Broadsher SS 316 sch. 160 flanged spools along with Pressure Test at 7500 psi, and Upgrading of C&K Manifold- MGS Line including PT at 10K psi and PWHT. _ Drill Ship STENA IceMAX _ USA GoM _ STENA DRILLING. - IWOCS Reeler Integration - Removal and re-installation of a new foundation for a larger ACE Reeler along with modification (angle rotation) of the winch foundation. _ Drill Ship LIBONGOS _ Offshore Angola _ SONADRILL . - IWOCS (Intervention Workover Control Systems) / Landing String Equipment and Foundations Intergration, such as : DWRE, N2, DLVA Reeler’s ; WorkShop & Spare Containers ; MCS and HPU Units. _ Scarabeo 9 _ Offshore Angola _ SAIPEM. - Participating on the re-activation of the Installation (Drill Ship) including piping and structural works: IWOCS Integration (foundation for XT Reeler on X-mas Tree Area), and prefabrication, installation and modification of low pressure lines (Cement unit drain line, Cement & Drain line flushing, Base oil line, Slug line..etc) including the valve access platforms. And helping to solve the completion of the Survey for "Coriolis System and Transfer Deck access platform" prefab. and installation. _ Drill Ship QUENGUELA _ Offshore Angola _ SONADRILL. - Well Test Package, 36” and 20” Casing conductors Integration during shell waters KORA-1_2nd well, Semi-sub 6th generation Scarabeo 9- Offshore Angola_ SAIPEM. - Xmas Tree, Guide posts and IWOCS Package Integration during deepwater KORA-1_1st well, Semi-sub 6th generation Scarabeo 9- Offshore Congo/Angola_ SAIPEM. - Installation of new Coil tubing reel foundation skid structure_ Drill Ship Saipem 12000- Offshore Ivory Coast_ SAIPEM. - MWD/ MLU and MPD (Managed Pressure Driling) Platforms Integration_ Drill Ship DS-9 – Las Palmas, Spain Shipyard_ VALARIS.

R
Repair / Project Manager 2008 nov - 2022 april
HARRIS PYE

Offshore-Marine-Power Services (Boilers repairs, EGCS & AEP Open and Close Loop Scrubber System Installation, BWTS Installation and many other pipe and steel jobs worldwide): - Achieving Projects/ Jobs following SoW (Scop of Work), Method Statements, Project Plan, Repair Procedures etc, Pipe jobs and Boiler Survey (full retubing, economizer, superheater’s, and drum’s along with internal part’s). - Project activities progress follow-up (sometimes for4 vessels simultaneously), on a daily basis; - Attending onboard daily meetings along with Ships Staff and onsite Client Representative, and KOM (Kick off Meeting), MOM (Moment off Meeting) as per requirements; - Coordination of Daily Meetings next day planning along with onboard HP teams- Ship Repairs Managers and Supervisors; - Project Planning Excel file up-dating and submitting to Top Management, on a daily basis; - Follow-up and attending to major equipment’s (electrical and mech.), pipelines, foundations etc installation on a daily basis following AutoCAD, NAVIWORKS, Inventor, CATIA V, ISO & Structure drawings, GA drawings, Boiler Manual, etc, also Client or representative suggestions; - Sorting out misalignments, clashes or any other drawings issue; - Follow-up Equipment’s/Spare Parts, delivery from Suppliers, Vendors to Shipyard, inventory/ recording of missing or miscorrelation, continuous recording and supervision of above-mentioned subjects in-between transfer process store and vessels; - Recording of goods transfer between involved parties for future referral as per MTO’s (Material’s Take Off- list); - Coordination and supervision of items transfer to on board before vessels departure; - Record and document goods transfer between all concerned parties (Shipyard/Integrator/Vendors/Vessel); - Issue, monitor and up-date Inventory Follow up file and liaise with logistic coordinators for each vessel; - Attending on all pipelines, tanks, boilers Hydro and Air Pressure Tests- BARR x time (hydrostatic pressure when is involve), as per SoW, Method Statement, Diagrams. - Supporting and coordinating workers with necessary information’s and materials for the daily tasks based project plan in order to roll the Project; - Checking and helping of teams memebers to complete their daily tasks; - Daily and continuously safety aspects ; - Participation at the daily meetings with owner representatives regarding progress to ensure project direction conformity and completion; - Solving and closing client representatives remarks, complains/ extra requests, and forthcoming jobs; - Fill up all jobs/ project’s forms/ paperwork request like: Acceptance Certificates, Pressure Test Cert, Field Service Report, Customer Appraisal, Cert of Cleanliness, NDT Reports (Non-Destructive Test), Welding Traceability Charts, Risk Assessment, TBT (Toolbox Talk) etc, also MOC (Management of Change) and VO (Variation Order) forms when situation required along with Client or Representative agreement based on Office 365 files. - Attending on Pre-commissioning, Commissioning, Sea Trail and MARPOL Tests and handover to the Onboard Team and Client Representative, etc. Project Details/ Type of Vessel or Site _ Job Location _ Client: - Vista class aft pool coaming replacement -M/V Oosterdam- At sea & Palermo, Italy DD_ HOLLAND AMERICA LINE - Replacement of x4 Desox Unit (Ecospray) on Engine Exhaust Gas Lines- M/V Aida Prima- Rotterdam, Nederland DD_ AIDA CRUISES - Scrubber Installation x 2 / Model CBHK- M/V Silver Shadow- Marseille, France DD_ SILVERSEA. - Port Side Boiler- Full Re-tubing on FPSO Mystras, offshore -Nigeria_ NPDC. - Main & Aux. Boilers isolation works/ installation of new 8 spectacle blinds along with new welded flanges, onboard of FPSO Saxi Batuque, offshore Angola_ ESSO. - Aux. Boiler water drum crack repair, and Inspection on Main Boiler along with some temporary repairs on membrane tubes, also on economizer onboard of FPSO Saxi Batuque, offshore Angola_ ESSO - Vacuum Condenser Dome Ends replacement, onboard of FPSO Triton, offshore Nord Sea_ Dana Petroleum. - EGCS- Open Loop Scrubber and BWTS Installation onboard of M/V Marjorie C., at sea – USA _ Pasha Hawaii. - EGCS- Open Loop Scrubber Installation onboard of M/V Oriole, Altamira Port, MEXICO _ Eagle Bulk. - EGCS- Open Loop Scrubber Installation onboard of M/V Jay, at sea MARROCO via UAE _ Eagle Bulk. - EGCS- Open Loop Scrubber Installation for 56/ 58 / 63 / 64 class onboard of M/V Puffin / Grebe / Kingfisher / Oriole / Bittern / Gannet / Madisson , Zhoushan Zhongtian Heavy Industry (ZTHI) Shipyard – Changbai Island , CHINA _ Eagle Bulk. - New Mooring System for Deep Water Installation onboard of West Eclipse- Semisubmersible Drill Rig, offshore Walvis Bay, NAMIBIA _ Seadrill. - Maintenance Jobs (Pipe & Steel) onboard of Cruise Vessel Oceana, at sea Spain via UAE _ P&O Cruises. - BIOMASS Pre-commissioning, site Barry Biomass, UK _ Qutotec. - EGCS- Open Loop Scrubber Installation onboard of Cruise Vessel Poesia , Dry Dock Marseille, FRANCE _ MSC. - Osaka Boiler Type, shell crack repair onboard of M/V Key Pacifico, Tusla Port, TURKEY _ Misuga Kaiun. - Complete installation and fit of x 9 Electrical Power Container Generators, Llandow workshop, UK _ SWCOGEN. - Biomass Installation, Teesside UK _ MGT Teesside. - Mitsubishi Boiler Type full re-tubing, onboard of M/V Gemer 8 Atlas, South Korea via Trinidad Tobago_ Northern Marine. - Pipe work onboard of Cruise Vessel Oceana, at sea Malta _ P&O Cruises. - Cold stacking preservation job onboard of Jack Drill Rig ATLA, DDW Dubai, UAE_ Borr Drilling. - DN1000 ballast line repair onboard of M/V LNG Adamawa, Nantes via Tenerife _ NSML Nigeria. - AEP Scrubber Installation onboard of Cruise Vessel Independence of the Seas, Caribbean Sea _ RCCL. - AEP Scrubber Installation onboard of Cruise Vessel Liberty of the Seas, Caribbean Sea _ RCCL. - GRP transfer lines Survey onboard of M/V LPG Alrar, quay side Marseille, FRANCE _ Norbulk. - AEP Scrubber Installation onboard of Cruise Vessel Liberty of the Seas, Caribbean Sea _ RCCL. - Span cans bracket replacement onboard of Ensco 102, Edinburg via Galveston USA_ ENSCO. - In charge with GF (George fisher) Workshop Llandow, UK _ RCCL. - AEP Scrubber Installation onboard of Cruise Vessel Freedom of the Seas, Caribbean Sea _ RCCL

Awards

Be the first to review “claudiughita1”

Your Rating for this listing